German Facility, Built at Breakneck Speed, Accepts Gas Shipment From U.S.

The shipment arrived at the LNG import terminal in the port town of Wilhelmshaven, a facility that was built in less than a year to help Germany avert an energy shortage.

Deja un comentario

Este sitio usa Akismet para reducir el spam. Aprende cómo se procesan los datos de tus comentarios.